Year Completed                 2023

Client                                  Woodview Construction

Scope of Works                 Drainage – Public and Private Stormwater and Wastewater

As per protocol for working within a school, all our staff were vetted prior to commencement of work.  We had to work closely with the school and Woodview to complete some of the work within the school holidays as to have minimum disruption to the school and children.  The initial scope was to install Cirtex Module SW Underground Detention Tank, install new stormwater and sewer, install Perforated Subsoil Drains, install new Rain Garden.

At a later date when then installed a 13,500 Ltr aboveground Plastic Water Tank.

There was also issues with the initial Rain Garden design so we had to remodel the Rain Garden to improve efficiency and workability.